Disused Stations: Hesketh Bank Station (2024)

Hesketh Bank station was on the West Lancashire Railway (WLR) Company’s Southport & Preston Railway which opened in stages between 19 February 1878 and 6 September 1882. The WLR was promoted by Sir Thomas George Fermor-Hesketh, Bart. Royal Assent was given for the ‘West Lancashire Railway’ on 14 August 1871. The Act authorised construction capital amounting to £150,000. James Brunlees and Charles Douglas Fox were appointed as civil engineers, and the contract for construction was let to Clarke Pruchard and Co. The first sod was cut at a special ceremony held at Little London, in Southport, attended by the Mayor, Alderman Squire JP, on 18 April 1873. From the start the WLR project struggled financially and, although construction started successfully, it stopped abruptly when the contractor faced financial difficulties. A further WLR Act of 1875 authorised the raising of a further £187,500 and granted an extension of time for the line’s completion. A new contractor, Barnes & Squire, was appointed, and work resumed.

Disused Stations: Hesketh Bank Station (1) The station opened on 20 February 1878 as Hesketh Bank & Tarleton. At the time of opening it was the northern terminus of the line to Hesketh Park, on the outskirts of Southport. The station was built by Messrs Bridge and Co of Burscough Junction. It was located on the west side of the bridge that carried Station Road over the line. The railway was double-track, and the
station had two platforms. The main building was a single-storey brick structure on the down (what would later be the Preston-direction) platform. The building was similar to those at other stations on the line, such as Longton Bridge, but was a larger version that was also used at Hesketh Park. The central section was a ridge-roofed structure aligned with a gable facing the platform where there was a canted bay. Wings, with round-headed door and window openings, extended on both sides. The up (Southport-direction) platform had a brick-built, enclosed waiting shelter. Wooden stairways led to each platform from Station Road, at the eastern end of the station. There was also a driveway to the main station building.
The goods yard was west of the station on the north (down) side) of the line. Originally consisting of a single siding and goods shed it was later altered; a second siding was added by 1893 along with a cattle-pen and weighing machine. South of the line, and west of the Disused Stations: Hesketh Bank Station (2)
station, was a siding that led through a turntable into a single-road engine shed which opened 19 February 1878. Hesketh Bank signal box, erected by McKenzie and Holland, controlled both the goods yard on the down side and the engine shed siding on the up side. It had 13 levers and was on the up side, adjacent to the engine shed siding and opposite the entrance to the goods yard.

At the time of opening Hesketh Bank was the northern terminus for trains to and from Hesketh Park, but on 10 June 1878 the line was extended southwards to Southport Windsor Road. On 1 August 1878 the line was extended a short distance eastwards to the banks of the River Douglas. A station was opened adjacent to the river’s west bank, from where the WLR operated a steamship service to Lytham St Annes. It was operated by the WLR-owned paddle steamer Virginia,and trains would have run eastwards beyond Hesketh Bank only to connect with steamboat services.

Disused Stations: Hesketh Bank Station (3)

In 1880 a 1¼-mile goods branch opened from Hesketh Bank to Tarleton, from a junction with the main line on the eastern side of the Station Road bridge. It was controlled by the River Douglas signal box and curved southwards from the WLR line. Its terminus was at Tarleton, adjacent to the Leeds & Liverpool Canal’s Tarleton branch. By 1882 the station was being referred to as Hesketh Bank for Tarleton.

Disused Stations: Hesketh Bank Station (4) On 18 May 1882 a further three-mile extension of the ‘main’ line opened from River Douglas to Longton. The river was crossed by an iron bridge with a swing-open section. The line was completed to Preston by September 1882 with special services running on 4 September for the Preston Guild week. Full public services began on15 September 1882. To coincide
with the line’s northward extension, it was also extended at the southern end into the new Southport Central station.

The engine shed closed on 18 May 1882 when Preston shed opened. It may have been used after that date to house the house the Tarleton branch loco but had been demolished by 1893.

Bradshaw of December 1895 showed 14 departures from Hesketh Bank to Preston on weekdays, the first at 7:02 am. Four of the trains (but only two on Thursdays) continued to Blackburn. There were 16 weekday departures for Southport Central, the first at 6:32 am. The station even had a Sunday service at this time with six services in each direction.

Bradshaw of December 1895 showed 14 departures from Hesketh Bank to Preston on weekdays, the first at 7:02 am. Four of the trains (but only two on Thursdays) continued to Blackburn. There were 16 weekday departures for Southport Central, the first at 6:32 am. The station even had a Sunday service at this time with six services in each direction, Disused Stations: Hesketh Bank Station (5)

On 1 July 1897 the Lancashire & Yorkshire Railway (LYR) took over the WLR. From 16 July 1900 the LYR closed the WLR Preston station and diverted trains into Preston’s main line station. From 1 May 1901 they closed Southport Central and transferred WLR line trains to the Southport Chapel Street terminus.

On 3 June 1912 the LYR introduced a ‘railmotor’ service between Crossens and Tarleton Halt, calling at Hesketh Bank - which lost the ‘for Tarleton’ suffix, although it appears to have been discontinued in company timetables from 1899. The railmotor was not a success and was withdrawn on 1 October 1913.

A 1918 signalling diagram showed that the goods yard facilities had been altered with the original cattle-pen being converted into a large goods loading wharf. A new horse and cattle loading dock was provided further west in the yard.

Disused Stations: Hesketh Bank Station (6)


On 1 January 1922 the LYR was absorbed by the London & North Western Railway but a year later that company became part of the London Midland & Scottish Railway (LMS). By summer 1932 Hesketh Bank had 17 weekday services to Southport and 16 to Preston. It also had one train to Todmorden, a train to Accrington and another to the ‘East Lancashire District’. The first departure was for Southport at 6:08 am. The last was also for Southport at 10:57 pm. There was a Sunday service at this time with six trains running to Preston and five to Southport.

Disused Stations: Hesketh Bank Station (7) In November 1930 the Tarleton Branch was officially closed but it had not been used for many years, and it had even been listed on a track diagram of November 1925 as closed but in situ. In 1935 the signal boxes at Hesketh Bank and at River Douglas closed, and a new box of LMS design was erected at Hesketh Bank, adjacent to the former WLR box. The new box
controlled a new ground frame at the Alty Brickworks siding, which had previously been controlled by the River Douglas box.

On 1 January 1948 Hesketh Bank became part of the nationalised British Railways (London Midland Region). By winter 1956/7 there were 21 weekday Preston services and 23 for Southport. The first and last departures were for Preston at 6:07 am and at 10:55 pm. Hesketh Bank continued to be served by trains on Sundays with six to Preston and five to Southport.

Whereas the LMR installed modern ‘totem’ signage at Banks and stations southwards, the remaining stations, including Hesketh Bank were not modernised, suggesting that their future was not secure. However Hesketh Bank had electric lighting installed in its later years, unlike other stations at the Preston-end of the line. Indeed in July 1959 Railway Magazine reported that the LMR was considering closure to all traffic of the route between Crossens – the terminus of the electric service – and Preston before the end of the year.

Whilst the line survived this threat, The Reshaping of British Railways (‘Beeching’) report of 1963 recommended the complete closure of the railway from Meols Cop to Preston. By this time the up refuge siding that formerly led to the engine shed had been lifted. The goods yard at Hesketh Bank appears from photographic evidence to have already gone out of use Disused Stations: Hesketh Bank Station (8)
by 1964, and it closed officially on 30 April of that year. Despite local protests the passenger service was withdrawn with effect from 7 September 1964, and the line from Hesketh Park to Preston closed completely. Track-lifting trains passed through Hesketh Bank station and ran up to the River Douglas bridge in the months following closure. The line was lifted in stages back towards Southport, and rails through the station were removed in February 1965. The station was demolished around the same time. It was later developed as a residential area.

Tickets from Alan Castle except 2479 Michael Stewart, route map drawn by Alan Young, Bradshaw from Chris Totty.

Sources:

To See other stations on the Southport - Preston (West Lancashire) line click on the station name: Southport Central, Southport Windsor Road, Southport Ash Street, St. Lukes, Hesketh Park, Churchtown, Crossens, Banks,
Hundred End,River Douglas, Hoole, Longton Bridge, ,
Penwortham (Cop Lane) & Preston West Lancashire

See also Tarleton Branch
Boat Yard Crossing Halt & Tarleton

& River Douglas Bridge

Hesketh Bank Station staff pose for an official photograph in 1899.By this time the station had become an important local railhead requiring the services of numerous personnel.Alty's Brickworks was by now a major employer and rail-traffic provider, and there was a brisk rail-borne trade in
local agricultural produce.
Photo from Alan Castle collection

Disused Stations: Hesketh Bank Station (9)

Disused Stations: Hesketh Bank Station (2024)

FAQs

What two locations identified for new station as part of abandoned Leicestershire railway restoration? ›

The first site would see it built in a car park overlooking the railway line next to the Belvoir Shopping Centre and Coalville Market Hall building. The other is on a local road, Wolsey Road, in an area fenced off by Network Rail.

Where was Hesketh Park Railway Station? ›

Station Name: HESKETH PARK
Date opened:20.2.1878
Location:North end of Parklands (cul-de-sac), off Roe Lane
Company on opening:West Lancashire Railway
Date closed to passengers:7.9.1964
Date closed completely:7.9.1964
5 more rows
Mar 6, 2024

What happens to abandoned railways? ›

While most lie dormant and are still under the ownership of the abandoning railroad company, some cause political controversies in communities through which they run due to property disputes once the land returns to adjacent landowners; others are converted to rail-trail use, an increasingly popular option that opens ...

Is the Ivanhoe line reopening? ›

The plans for phase one currently involve the return to operation of stations at Coalville, Ashby-de-la-Zouch (seen in above image) and Swadlincote/Castle Gresley. If the business case is approved, work on the restoration could start in 2024.

When was Hesketh Park built? ›

Hesketh Park, Southport, opened in 1868, is designated at Grade II* for the following principal reasons: * Date: the park is an early example of a municipal park; * Design: although enhanced, the park's design is essentially unchanged from its original layout; * Designer: the park was laid out by the leading designer ...

What railway station in London is named after a famous battle? ›

London Waterloo station was built in 1848, named after nearby Waterloo Bridge , which opened in 1817 and named after the famous battle (1815) when Britain (plus Prussia) definitively defeated Napoleon Bonaparte.

What happened to the Potter Street station? ›

This never happened and thus, the station was used as a crew base for many years up until 1986. Then in 1986 CSX Transportation, C&O's new owners closed the station. Today Potters Street Station It is currently vacant and owned by a non-profit organization called The Saginaw Depot Preservation Corporation (SDPC).

What two cities in England did the first railway connect? ›

The Liverpool and Manchester Railway (L&MR) was the first inter-city railway in the world. It opened on 15 September 1830 between the Lancashire towns of Liverpool and Manchester in England.

What two cities did the 1st railway in Great Britain connect? ›

The first purpose built passenger railway, the Liverpool and Manchester Railway, was authorised by Act of Parliament in 1826.

What was the name of the new rail station that Vanderbilt constructed in New York City How big was it? ›

In 1871, the magnate Cornelius "Commodore" Vanderbilt created Grand Central Depot for the New York Central & Hudson River, New York and Harlem Railroad, and New Haven railroads. Due to rapid growth, the depot was reconstructed and renamed Grand Central Station by 1900.

Between which two stations the first public railway line was opened in 1825 in northern England? ›

The first railway line in England was opened between Stockton and Darlington in 1825. Following this, 15,000 miles of the railway network was completed in the next 40 years.

Top Articles
Latest Posts
Article information

Author: Madonna Wisozk

Last Updated:

Views: 5453

Rating: 4.8 / 5 (68 voted)

Reviews: 83% of readers found this page helpful

Author information

Name: Madonna Wisozk

Birthday: 2001-02-23

Address: 656 Gerhold Summit, Sidneyberg, FL 78179-2512

Phone: +6742282696652

Job: Customer Banking Liaison

Hobby: Flower arranging, Yo-yoing, Tai chi, Rowing, Macrame, Urban exploration, Knife making

Introduction: My name is Madonna Wisozk, I am a attractive, healthy, thoughtful, faithful, open, vivacious, zany person who loves writing and wants to share my knowledge and understanding with you.